Seattle Public Utilities Longfellow Creek Natural Drainage System

Designing with Water, Community, and Place

Looking for ways to improve water quality and pedestrian connections within the Longfellow Creek basin, Seattle Department of Transportation collaborated with MIG’s civil engineers and landscape architects to create impactful, technical solutions for the Longfellow Creek Natural Drainage System (NDS), a Seattle Public Utilities-led capital improvement project.

MIG’s civil engineers and landscape architects guided the work from options analysis through final design and provided construction administration support. The work involved evaluating potential sites through field reconnaissance, preliminary concepts, and alternatives analysis—helping the City identify three locations for implementation. Together, the sites manage stormwater runoff from approximately 33 acres of streets and developed properties, with conditions ranging from four blocks of residential street on a curbless roadway to a street end at Longfellow Creek and a retrofit along an arterial.

MIG designed integrated stormwater retrofits including bioretention and planting, storm drainage infrastructure, creek outfall improvements, sidewalks and roadway improvements, and coordination for a wetland boardwalk and creek bridge. The team also coordinated utility relocations, environmental permitting, community outreach, and public art.

The project demonstrates how natural drainage investments can address stormwater, pedestrian connectivity, habitat, art, and infrastructure needs while responding to the character and constraints of each site.