

Wyatt Way Complete Street Reconstruction
Wyatt Way is an important arterial through Bainbridge Island’s Winslow neighborhood, connecting the south end of the island with downtown. While the City had attempted to improve two key intersections along the corridor in the past and plan for future sidewalks and bike lanes, the planning process stalled due to residents’ concerns about neighborhood character and property impacts.
MIG delivered a robust community participation process and strategic development concept to build support among the community, City staff, and City Council. The transparent design process helped Bainbridge Island move from a contested intersection concept to a community-supported corridor vision.
The work involved multiple intersection configurations, including traffic signals, RRFBs, and roundabouts, considering neighborhood connectivity, property impacts, pedestrian, bicycle, and vehicle safety, and consistency with the City’s Comprehensive Plan. Community members and a local non-motorized advisory group reviewed the alternatives—allowing stakeholders opportunities to understand tradeoffs and help shape the preferred design.
The final concept expanded the corridor, replaced an existing four-way stop with a mini-roundabout, and added sidewalks and bike lanes. The concept received unanimous support from City Council. The City retained MIG for final engineering and landscape design, and the project was constructed in 2021.