Totem Lake Connector

Bridging More Than Distance

Cross Kirkland Corridor is a scenic, bustling linear park and multi-use trail connecting Kirkland’s neighborhoods and linking to the regional Eastrail network for commuting and recreation. Two high-traffic road crossings with direct connections to I-405 interrupted the flow for people walking and biking along the corridor at Totem Lake Boulevard NE and NE 124th Street.

The solution: a grade-separated connection via Totem Lake Pedestrian Bridge, providing a safer, more direct link along the corridor. MIG provided civil engineering and landscape architecture services from the initial Type, Size, and Location Study through final design, permitting, and construction. Limited right-of-way, challenging topography, wetlands, and existing open ditches required an integrated approach to site the bridge and supporting infrastructure.

The design maximizes the limited space while meeting flow control requirements. The shared-use path incorporates porous asphalt and bioretention cells to infiltrate stormwater runoff. Landscape improvements include vegetated MSE walls, native vegetation restoration, invasive species removal, and environmental mitigation, including habitat snags created from felled trees.

The completed project gracefully integrates pedestrian and bicycle connectivity with stormwater, landscape, and environmental improvements.